Double block and bleed, dual chamber orifice fitting FPD220
Proven Dual isolation (DBB) of the process from the environment during orifice plate changes
– no need to isolate the complete metering stream
Minimized venting of gas volume
– only the small volume contained within the meter upper chamber is vented
Substantial saving in operating costs and production
– potential annual savings of $50k per stream in reduced downtime
– typically only 30 minutes to exchange a plate instead of many hours
Elimination of parallel streams or bypass lines
– less maintenance and less inspection time
– reduced weight and cost
– a higher level of visible safety